Camp Tolochee & Scout Office Improvement Projects
 
These are some of the projects at Camp and Scout Office !!!
 
                
Dining Hall 
 Hand-washing Station
 Grade for better drainage
 Roof Repair
 Ventilator Hood
 Drainage Holding Tank
 Upgrade Electrical Service
 Kitchen Ventilation
Silver Beaver Building
Wheel Chair Ramp
 Porch Railing
 Porch Screening
 Underpinning/Skirting
 Repair Siding
Pool  Build Cookout Area/Day Shelter/Educational Pavillion
Rangers Residence
 Grade front of house for better drainage
 Patch Leaking Roof
Storage Area
 Brush and Tree Removal
 Ospho and Paint Roof
Campsites
 Duplex to each Campsite
 Develop permanent site location
 Adirondacks in each Campsite
 Permanent Shelter in each Campsite
 Convert Croatan to a Handicapped assessable Campsite
 Bulletin Board in each Campsite
 Replace Sign Posts   
Council Fire Ring
 Replace Boards in seating area
 Plumb water to area
Denkle Chapel  Replace Boards in seating area
Archery Shelter
 Shelter Deck
 Storage Box Under Shelter
Athletic Field
 Soccer Goals
 Basketball Goal
Village
 Tether Ball Court
 Volleyball Court
 Chin up Bar
Camp Sign 
 Program Areas
 Markers along causeway 30 ft apart and 4 ft high
Road   Build up and Grade 
Pond  Silt Fencing
Camp Wish List
 Compound Miter Saw
 Pressure Treated Lumber
 T-111 Siding
Waycross Office Needs

 

 Privacy Fence Replacement
 Irrigation System
 Landscape Office